Zip Tie Change Order Decal - hard hat decal

Zip Tie Change Order Decal

1 Decal
$4.00
Skip to product information
Zip Tie Change Order Decal - hard hat decal

Zip Tie Change Order Decal

$4.00
BUY 2, GET 1 FREEMix any 3 singles - one is free. Tap to turn it onIt's ON. Add any 3 singles to your cart - the free one comes off at checkout.
Copies of this design

Same design, more copies: 3 for $8 ($2.67 ea) · 6 for $12 ($2.00 ea) · 10 for $17 ($1.70 ea) · 20 for $25 ($1.25 ea)

Best Sellers 10-PackCan't pick just one?10 different designs, $20. $2 a decal. Free standard shipping (orders $20+ after discounts).See the 10-pack →

Want different designs? Shop all packs

Printed and mailed within 2 business days from Northern California. $2.79 mail or $6.95 tracked - free standard shipping on orders $20+ after discounts. Shipping & returns

If a zip tie can't fix it, it's a change order. The field engineer's rule.

  • 2.5 inch hard hat decal
  • Outdoor eco-solvent print, made to order in our own shop
  • UV and weather rated, sticks to a lid, a cooler or a toolbox
  • Printed to order in California
  • Sold as a single decal
Size and material

2.5 inches on the long side - sized for the flat front panel of a standard hard hat, without wrapping onto the curve where decals lift. Outdoor eco-solvent print, UV and weather rated, printed to order in our own shop. Also sticks to a cooler, a toolbox or a hard case.

How to apply

Follow your hard hat maker's instructions first - some limit which cleaners, adhesives or stickers can go on the shell, and where.

If they allow it, wipe the spot with isopropyl alcohol and let it dry, then press from the centre outward.

Check your employer first - some sites prohibit decals. Keep them off any area you need to inspect, and never cover a crack or gouge.

Shipping & returns

Printed and packed within 2 business days, then mailed from Northern California - most US mail lands within about a week. Standard mail has no tracking: $2.79, or free on orders $20+ after discounts. Want a tracking number? Pick USPS Tracked ($6.95) at checkout. US only for now.

Damaged, or will not stick to a clean surface? We replace it or refund it. Unused decals can come back within 30 days. Full policy

Made in CaliforniaCut on our own machine in Northern California
Free standard shippingOn orders $20+ after discounts
30-day returnsOn unused decals. Damaged? We replace it.
2.5 in on the long sideSized for the flat front of a hard hat

You may also like